Orsted navigates a competitive landscape shaped by powerful buyer bargaining, intense rivalry, and the looming threat of substitutes. Understanding these forces is crucial for any stakeholder looking to grasp their strategic position.
The complete report reveals the real forces shaping Orsted’s industry—from supplier influence to threat of new entrants. Gain actionable insights to drive smarter decision-making.
Suppliers Bargaining Power
The market for crucial offshore wind components, such as massive turbines and specialized grid infrastructure, is highly concentrated. A small number of dominant manufacturers control the supply of these essential parts, giving them considerable influence.
This supplier concentration translates into significant bargaining power, particularly as demand surges in the booming renewable energy sector. These suppliers can dictate pricing and influence delivery timelines, impacting projects like those undertaken by Ørsted.
For instance, in 2024, the lead times for procuring new offshore wind turbines from major manufacturers like Siemens Gamesa and Vestas have extended, sometimes exceeding 24 months, a direct consequence of high global demand and limited production capacity. Ørsted actively manages this by entering into long-term agreements and fostering strategic alliances with key suppliers to secure capacity and favorable terms.
Suppliers of highly specialized renewable energy technologies, like advanced wind turbine components or novel energy storage systems, wield significant influence. Their unique intellectual property and deep expertise mean fewer alternatives exist, amplifying their bargaining power. Ørsted's dependence on these cutting-edge suppliers for its ambitious projects underscores this dynamic.
The bargaining power of suppliers is a significant concern for Ørsted, particularly due to the volatile nature of raw material costs. Essential components for wind turbines and other renewable energy infrastructure, such as steel, copper, and critical rare earth metals, have experienced considerable price swings. For instance, the price of copper, a key conductor in electrical systems, saw significant increases through 2021 and 2022, impacting project economics.
Geopolitical instability and ongoing logistical challenges further amplify these supply chain vulnerabilities. These factors can lead to unexpected cost escalations and project delays, directly affecting Ørsted's ability to deliver projects on time and within budget. The complexity of global supply chains means that disruptions in one region can have a ripple effect across the entire industry.
High Switching Costs for Integrated Systems
Once Ørsted commits to a particular supplier's technology or integrates their components into a large-scale project, switching to an alternative supplier can incur substantial costs and delays. This is due to the complex integration requirements, certification processes, and the bespoke nature of large renewable energy installations, tying Ørsted to its existing supplier relationships.
For instance, in 2024, the offshore wind sector continued to see significant investments in specialized turbine technologies and foundation designs. A shift in a core component supplier for a project like the Hornsea 3, a massive offshore wind farm with a capacity of 2.8 GW, could necessitate extensive re-engineering and recertification, potentially adding millions in costs and months to project timelines.
- High Integration Complexity: Renewable energy projects, especially offshore wind, involve highly specialized and integrated systems. Changing a key component supplier often means re-evaluating and adapting the entire system architecture.
- Certification and Regulatory Hurdles: Components used in energy infrastructure require rigorous certification. Switching suppliers means initiating new, often lengthy and expensive, certification processes to meet safety and performance standards.
- Bespoke Project Requirements: Large-scale renewable energy projects are frequently customized. This means components may not be off-the-shelf, and a new supplier would need to develop or adapt products specifically for Ørsted's unique project needs, increasing switching costs.
Limited Availability of Specialized Installation Vessels and Services
The construction and maintenance of offshore wind farms demand highly specialized installation vessels and skilled technicians, a resource pool that remains notably limited on a global scale. This scarcity directly translates into increased bargaining power for the few companies that possess these capabilities.
For a company like Ørsted, this translates into significant leverage for specialized service providers and vessel operators. They can command higher rates and dictate terms, directly impacting project timelines and overall costs. For instance, the global fleet of jack-up vessels suitable for offshore wind installation is finite, and demand has been escalating rapidly with the expansion of the offshore wind sector worldwide.
- Limited Global Fleet: The number of vessels specifically designed for the complex installation of offshore wind turbines remains constrained.
- Rising Demand: As more countries and companies invest in offshore wind, the competition for these specialized assets intensifies.
- Cost Implications: This supply-demand imbalance allows specialized providers to charge premium rates, increasing capital expenditure for developers like Ørsted.
- Project Delays: The availability of these vessels can also become a bottleneck, potentially leading to project scheduling challenges and delays.
The bargaining power of suppliers to Ørsted is substantial, driven by the concentrated nature of critical component manufacturing and the specialized expertise required in the offshore wind sector. This is evident in extended lead times for key equipment like turbines, with 2024 seeing delivery schedules for new offshore wind turbines from major players like Siemens Gamesa and Vestas stretching beyond 24 months due to high global demand and production constraints.
The reliance on suppliers with unique intellectual property, such as those providing advanced turbine components or novel energy storage systems, further amplifies their leverage. This dependence is critical for Ørsted's ambitious projects, as switching these specialized suppliers can incur significant costs and project delays, potentially running into millions and months, as seen with the complex integration and certification needs for large-scale projects like Hornsea 3.
Furthermore, the limited global availability of specialized installation vessels and skilled technicians in 2024 allows these service providers to command higher rates and dictate terms, directly impacting Ørsted's project timelines and overall capital expenditure. This scarcity, coupled with escalating demand across the expanding offshore wind sector, creates a significant imbalance favoring suppliers of these essential services.
What is included in the product
This Orsted Porter's Five Forces analysis breaks down the competitive intensity and profitability potential within the renewable energy sector, focusing on the company's unique market position.
Effortlessly identify and mitigate competitive threats with a dynamic visualization of all five forces, enabling proactive strategy adjustments.
Customers Bargaining Power
Ørsted's main customers are large utilities and major corporations that require long-term contracts for renewable energy, known as Power Purchase Agreements (PPAs). These significant buyers, due to their substantial energy needs and advanced procurement strategies, possess considerable negotiation power. This allows them to secure advantageous terms, including pricing and contract lengths, directly impacting Ørsted's revenue and profitability.
Customers are becoming much more informed about their energy choices, especially regarding environmental impact. This growing awareness means they are actively looking for companies that prioritize sustainability, and they are willing to choose those providers. In 2023, for instance, global renewable energy investment reached a record $1.7 trillion, a clear signal of this customer-driven shift.
This increased knowledge gives customers more leverage. They can now demand not just competitive prices but also clear proof of a company's green credentials and the introduction of new, eco-friendly energy products. For a company like Ørsted, this translates into pressure to offer better value and more transparent sustainability reporting.
The availability of alternative green energy providers significantly impacts Ørsted's bargaining power with its customers. While Ørsted is a major player in offshore wind, customers can readily access solar, onshore wind, and other renewable energy solutions from a variety of reputable developers. This competitive landscape means customers have the flexibility to compare pricing, contract terms, and service offerings across different suppliers.
In 2024, the renewable energy sector continued to see robust growth, with significant investments in solar and onshore wind projects alongside offshore wind. For instance, global renewable energy capacity additions reached new highs in 2024, with solar and wind power leading the charge. This proliferation of options empowers customers to negotiate better terms or switch to providers offering more favorable conditions, thereby increasing their bargaining power against Ørsted.
Regulatory Influence on Energy Procurement
Government policies, subsidies, and renewable energy mandates play a crucial role in shaping customer power within the energy sector. For instance, in 2024, the Inflation Reduction Act in the United States continued to offer significant tax credits for renewable energy installations, directly impacting the cost and thus the negotiating leverage of commercial and industrial customers seeking to procure green energy.
These favorable regulations empower customers by providing financial incentives for adopting renewable energy sources. This can translate into a stronger position when negotiating power purchase agreements (PPAs) with energy providers like Ørsted, as customers can demonstrate a clear financial benefit from choosing specific renewable solutions.
The bargaining power of customers is amplified when government incentives reduce the overall cost of renewable energy. For example, feed-in tariffs or renewable portfolio standards can make it more economically viable for customers to demand specific types of renewable energy, thereby increasing their negotiating leverage with suppliers.
- Government incentives, such as the US federal solar tax credit, can reduce the upfront cost of renewable energy for customers by up to 30% in 2024, enhancing their negotiating position.
- Renewable energy mandates, like those in California requiring utilities to source a certain percentage of power from renewables, indirectly empower large customers by increasing the supply of green energy options.
- Subsidies for battery storage, which are becoming increasingly common, allow customers to negotiate for more integrated and reliable renewable energy solutions, further strengthening their bargaining power.
- Regulatory frameworks that promote direct PPA markets give customers more choices and transparency, enabling them to secure better terms for their energy procurement.
Long-Term Contracts and Offtake Agreements
Ørsted frequently enters into long-term offtake agreements for its renewable energy projects. These contracts, often spanning 15-25 years, provide significant revenue predictability. For instance, in 2023, Ørsted continued to secure such agreements, like the one for the Ørsted offshore wind farm in Germany, which has a power purchase agreement for 18 years.
However, these long-term commitments can also empower customers. During renegotiations or when new projects are being considered, customers can leverage their position, especially if market energy prices have fallen since the original contract was signed. This is particularly true when tendering for new capacity, where competitive pricing becomes a key factor, allowing customers to exert pressure on Ørsted.
- Revenue Stability vs. Pricing Lock-in: Long-term offtake agreements provide Ørsted with predictable revenue streams, crucial for financing capital-intensive offshore wind projects.
- Customer Bargaining Leverage: Despite contract terms, customers can wield influence during renegotiations or new project tenders, especially if market conditions favor them.
- Market Shift Impact: A significant drop in wholesale energy prices post-contract signing can strengthen a customer's bargaining position when seeking to renew or secure new agreements.
Customers, particularly large utilities and corporations, possess significant bargaining power due to their substantial energy needs and the long-term nature of Power Purchase Agreements (PPAs). Their ability to negotiate favorable pricing and contract durations directly influences Ørsted's financial performance.
The increasing customer awareness of environmental impact and the growing availability of diverse renewable energy options empower buyers to demand better terms and greater transparency. In 2024, the continued robust growth and investment in solar and onshore wind alongside offshore wind provided customers with more choices, enhancing their negotiating leverage.
| Factor | Impact on Ørsted | Customer Leverage |
| Large Customer Base | High reliance on major buyers | Customers can dictate terms due to volume |
| Contract Duration (PPAs) | Revenue predictability | Leverage during renegotiations if market prices fall |
| Availability of Alternatives | Increased competition | Customers can switch providers for better deals |
| Customer Awareness | Demand for sustainability | Pressure to offer competitive green credentials |
Same Document Delivered
Orsted Porter's Five Forces Analysis
This preview showcases the complete Ørsted Porter's Five Forces analysis, detailing the competitive landscape and strategic positioning of the company within the renewable energy sector. The document you see here is precisely the same professionally formatted and insightful analysis you will receive instantly upon purchase, offering a comprehensive understanding of industry rivalry, buyer and supplier power, and the threat of new entrants and substitutes.
Rivalry Among Competitors
The global offshore wind sector, a key arena for Ørsted, is defined by fierce competition in auctions for crucial lease areas and revenue-guaranteeing Contracts for Difference (CfDs). This intense bidding environment means that companies must be highly efficient and innovative to secure projects.
Major international energy players and established utilities are actively participating, leading to aggressive bidding that can compress profit margins. For instance, in the UK's Allocation Round 4 (AR4) auction, which concluded in 2022, record low prices were achieved, demonstrating the pressure on developers.
This competitive landscape necessitates substantial capital investment in advanced technologies, supply chain development, and extensive project planning. Companies like Ørsted must maintain a strong financial footing and operational excellence to navigate these demanding auctions successfully.
Ørsted operates in a competitive landscape populated by established global energy players. Traditional fossil fuel giants like BP and Shell are increasingly investing in renewable energy, bringing substantial financial muscle and existing infrastructure to the sector. For instance, BP announced plans to invest up to $100 billion in low-carbon energy by 2030, demonstrating a significant shift.
European utilities such as RWE and Iberdrola also pose significant competition. These companies have deep technical expertise and established market positions, allowing them to leverage existing customer bases and regulatory relationships. Iberdrola, for example, has been a major investor in offshore wind, aiming for 9 GW of offshore wind capacity by 2030.
Competitors in the offshore wind sector are locked in a relentless pursuit of innovation, driving advancements in turbine technology for greater efficiency and lower costs. This includes developing larger, more powerful turbines and creating integrated energy solutions to capture more value. For Ørsted, staying ahead means constantly innovating its project development processes and optimizing operational expenditures to maintain its competitive position.
Geographic Expansion and Market Share Battles
The global pursuit of renewable energy dominance fuels intense competition. Companies are aggressively vying for market share in burgeoning regions like Asia-Pacific and North America, where the demand for clean energy is rapidly escalating. This geographic expansion directly translates into fierce battles for securing new offshore wind projects, forging strategic alliances, and attracting specialized engineering talent.
Ørsted, a key player, is actively participating in this global race. For instance, in 2023, the company secured a significant offshore wind lease area in the US, demonstrating its commitment to expanding its North American footprint. This expansion inevitably brings it into direct competition with other major developers for both project opportunities and the limited pool of experienced personnel needed to execute these complex ventures.
- Asia-Pacific Growth: By 2023, the Asia-Pacific region was projected to become the largest offshore wind market globally, with countries like China and South Korea leading the charge in new installations.
- North American Expansion: Ørsted's 2023 US lease acquisition highlights the strategic importance of North America, a market expected to see substantial growth in offshore wind capacity over the next decade.
- Talent Scarcity: The rapid expansion of the offshore wind industry has led to a shortage of skilled professionals, intensifying competition for experienced engineers and project managers across all major markets.
Impact of Regulatory and Policy Changes
Government policies, including subsidies, tax credits, and the speed of permitting, are pivotal in shaping the competitive intensity within the renewable energy sector. These governmental levers directly impact project economics and the attractiveness of new market entrants.
Recent shifts in policy have demonstrated this impact. For instance, challenges in the US offshore wind market, stemming from regulatory hurdles and evolving subsidy structures, have led to project delays and re-evaluations, affecting the competitive positioning of established players like Ørsted. In 2024, the US government continued to refine its approach to offshore wind development, with ongoing discussions around permitting streamlining and long-term tax credit stability. For example, the Inflation Reduction Act of 2022, which provides significant tax credits for renewable energy projects, remains a key driver, but its long-term effectiveness is still being assessed by the market as specific implementation details unfold throughout 2024.
- Policy Uncertainty: Fluctuations in government support, such as changes to Investment Tax Credits (ITCs) or Production Tax Credits (PTCs), can drastically alter project profitability and investor confidence.
- Permitting Processes: Lengthy and complex permitting procedures, a significant factor in the US offshore wind market in 2023 and continuing into 2024, can delay project timelines and increase costs, creating barriers to entry and impacting existing players.
- Subsidies and Incentives: The availability and structure of subsidies, like those seen in European markets, directly influence the speed of deployment and the competitive advantage of companies that can effectively leverage these programs.
- Market Access: Government-backed auctions and power purchase agreements (PPAs) create direct market access, influencing which companies can secure projects and establish a strong competitive foothold.
The competitive rivalry within the offshore wind sector is characterized by intense bidding for project sites and power contracts, forcing companies like Ørsted to operate with high efficiency and innovation. Major energy companies and utilities are aggressively participating, driving down prices and compressing profit margins, as seen in the record low prices achieved in the UK's AR4 auction in 2022.
Established global energy giants such as BP and Shell, along with European utilities like RWE and Iberdrola, are significant competitors, bringing substantial financial resources and market expertise. For instance, Iberdrola aims for 9 GW of offshore wind capacity by 2030, underscoring the scale of investment from rivals. This necessitates continuous innovation in turbine technology and project development for Ørsted to maintain its edge.
The rapid global expansion of offshore wind, particularly in Asia-Pacific and North America, intensifies competition for market share and skilled talent. Ørsted's 2023 US lease acquisition exemplifies this, placing it in direct competition with other developers for project opportunities and experienced personnel, as the industry faces a shortage of qualified professionals.
Government policies significantly influence competitive dynamics; for example, the US offshore wind market has seen project delays due to regulatory hurdles and evolving subsidy structures. The Inflation Reduction Act of 2022, providing substantial tax credits, remains a key factor in 2024, though its long-term market impact is still unfolding.
| Competitor | Key Focus Area | Notable Investment/Target (as of latest available data) | Competitive Action |
|---|---|---|---|
| BP | Low-carbon energy transition | Up to $100 billion by 2030 | Increasing investment in renewables, including offshore wind |
| Shell | Renewable energy projects | Significant investments in offshore wind development globally | Expanding offshore wind portfolio, often through partnerships |
| RWE | Renewable energy generation | Major investor in offshore wind, particularly in Europe | Leveraging existing expertise and market positions |
| Iberdrola | Offshore wind capacity | Target of 9 GW by 2030 | Aggressively pursuing new projects and market expansion |
SSubstitutes Threaten
Despite the significant global investment in renewables, conventional fossil fuels like coal and natural gas continue to pose a substantial threat of substitution for base-load power generation. This is primarily due to their established infrastructure and ability to provide consistent, dispatchable energy, a crucial element for grid stability that intermittent renewables sometimes struggle to match without extensive storage solutions. In 2024, natural gas, for instance, still accounted for a considerable portion of electricity generation in many developed economies, underscoring its role as a readily available alternative.
Other renewable energy sources, such as hydropower, geothermal, and advanced bioenergy, present a tangible threat of substitution to Ørsted's core wind and solar power business. While Ørsted has diversified into bioenergy, its significant investment in offshore and onshore wind, along with solar farms, means these alternative technologies can compete for market share in various energy generation scenarios. For instance, in regions with abundant water resources, hydropower can offer a stable and cost-effective baseload power alternative, potentially limiting the demand for new wind or solar installations.
Improvements in energy efficiency and the rise of smart grid technologies directly reduce the need for new electricity generation. This trend, often supported by demand-side management programs, acts as a substitute for traditional power sources, including large-scale offshore wind projects that Ørsted specializes in. For instance, the International Energy Agency reported in 2024 that energy efficiency measures saved the equivalent of the European Union's total final energy consumption in the power sector in 2023.
Distributed Generation and Rooftop Solar
The increasing adoption of distributed generation, particularly rooftop solar, presents a significant threat of substitutes for companies like Ørsted. This shift allows consumers to generate their own electricity, reducing reliance on traditional utility providers.
For instance, in 2024, the global distributed solar market continued its robust growth, with installations projected to reach new highs. This decentralized approach directly competes with the utility-scale renewable energy projects that form a core part of Ørsted's business model.
- Rooftop solar installations are becoming more affordable and accessible globally.
- Consumers are increasingly seeking energy independence and control through self-generation.
- Policy support and technological advancements are further incentivizing distributed energy solutions.
Advancements in Energy Storage Solutions
Advancements in energy storage solutions, particularly in cost-effective and scalable battery technology, pose a potential threat of substitution for Ørsted's large-scale renewable energy projects. While storage currently complements renewables by mitigating intermittency, breakthroughs could make smaller, distributed generation methods more competitive alternatives. For instance, by mid-2024, the levelized cost of energy (LCOE) for utility-scale battery storage systems has continued to decline, making them increasingly attractive for grid stabilization and peak shaving, potentially reducing reliance on large offshore wind farms for certain grid services.
These improvements in storage could empower more localized or less capital-intensive generation methods to emerge as viable substitutes. Imagine communities or industrial parks adopting their own integrated solar and storage systems, thereby lessening their dependence on large, centralized renewable power purchase agreements. This shift could fragment demand for Ørsted's core offerings, as these smaller, self-sufficient solutions become increasingly practical and economically feasible.
While Ørsted focuses on wind and solar, other established and emerging renewable sources like hydropower and geothermal can serve as direct substitutes for electricity generation, especially where they offer more consistent output. Furthermore, the increasing efficiency of energy consumption, coupled with advancements in distributed generation like rooftop solar, directly reduces the overall demand for large-scale power projects, thereby acting as a substitute for Ørsted's core business model.
Entrants Threaten
Developing and constructing large-scale renewable energy projects, particularly offshore wind farms, demands substantial capital. For instance, a single offshore wind farm can cost billions of dollars to develop and build, a figure that naturally deters smaller or less capitalized entities from entering the market.
This high capital intensity creates a significant barrier to entry. Companies like Ørsted, with established access to financing and a proven track record, are better positioned to absorb these upfront costs compared to new entrants who may struggle to secure the necessary funding for such massive undertakings.
In 2023, global investment in offshore wind reached approximately $70 billion, highlighting the scale of capital required. This immense financial commitment acts as a formidable shield, protecting established players from the immediate threat of widespread new competition.
New entrants in the offshore wind sector, like Ørsted, confront a formidable array of regulatory and permitting hurdles. These often involve lengthy environmental impact assessments and securing approvals across multiple jurisdictions, a process that can take years. For instance, in 2024, the permitting timeline for new offshore wind projects in the US continued to be a significant challenge, with some projects experiencing delays due to comprehensive reviews.
Navigating this intricate legal and administrative maze requires substantial specialized expertise and considerable financial resources. The sheer complexity and cost associated with compliance can act as a powerful deterrent, effectively limiting the number of new companies that can realistically enter the market and compete with established players like Ørsted.
The design, engineering, construction, and operation of advanced renewable energy facilities, especially offshore wind, demand highly specialized technical expertise and proprietary technologies. New entrants would face significant hurdles in acquiring or developing this knowledge, which is a substantial undertaking.
Access to Grid Infrastructure and Offtake Agreements
New entrants in the offshore wind sector face significant hurdles in securing access to essential grid infrastructure. Established companies like Ørsted have long-standing relationships and pre-existing grid connections, creating a substantial barrier for newcomers attempting to connect to the power grid. This often translates to higher upfront costs and longer development timelines for new players.
Furthermore, establishing reliable offtake agreements with energy buyers is critical for the financial viability of any new offshore wind project. Ørsted, with its extensive track record and scale, can negotiate favorable power purchase agreements (PPAs), often securing better terms than emerging competitors. This advantage in securing stable revenue streams makes it difficult for new entrants to compete on price and risk.
- Grid Connection Costs: In 2024, the cost of grid connection for new offshore wind farms can range from tens to hundreds of millions of dollars, depending on the location and capacity.
- Offtake Agreement Competition: Established players often have secured PPAs for a significant portion of their future capacity, limiting the availability of attractive offtake opportunities for new entrants.
- Relationship Advantage: Ørsted’s established relationships with grid operators and energy off-takers provide a distinct competitive edge in securing timely and cost-effective grid access and sales agreements.
Economies of Scale and Experience of Incumbents
Existing players like Ørsted leverage substantial economies of scale, particularly in offshore wind. This scale translates into lower costs for everything from turbine procurement to project financing and operational maintenance, creating a significant barrier for newcomers. For instance, in 2023, Ørsted's substantial project pipeline and operational capacity allowed it to secure favorable terms with suppliers, a feat difficult for smaller, less established entities to match.
The accumulated experience of incumbents like Ørsted in navigating complex regulatory environments, managing large-scale construction, and optimizing asset performance provides a crucial competitive edge. Their established supply chains and deep understanding of project risks are invaluable. By 2024, Ørsted had successfully commissioned over 9 GW of offshore wind capacity globally, a testament to its operational expertise and established relationships.
New entrants face considerable challenges in replicating the efficiency and cost-effectiveness derived from years of operational experience and scale. These advantages include:
- Lower per-unit costs: Due to bulk purchasing and optimized logistics.
- Reduced project development risks: Stemming from proven methodologies and a deep understanding of site-specific challenges.
- Stronger supplier relationships: Built on long-term partnerships and significant order volumes.
The threat of new entrants for Ørsted is generally low due to several significant barriers. The sheer capital required for offshore wind projects, often running into billions of dollars, deters smaller players. For example, global investment in offshore wind reached approximately $70 billion in 2023, underscoring this financial hurdle.
Navigating complex regulatory and permitting processes, which can take years and demand specialized expertise, further limits new competition. In 2024, permitting timelines in the US remained a notable challenge for new offshore wind developments.
Moreover, established players like Ørsted benefit from existing grid connections and strong relationships with energy off-takers, securing favorable power purchase agreements. This makes it difficult for newcomers to secure essential infrastructure and stable revenue streams.
| Barrier Type | Description | Impact on New Entrants | Supporting Data (2023-2024) |
| Capital Intensity | High upfront investment for offshore wind projects. | Significant deterrent due to massive financial requirements. | Global offshore wind investment ~$70 billion (2023). |
| Regulatory Hurdles | Lengthy and complex permitting and environmental assessments. | Requires specialized expertise and can cause project delays. | Permitting timelines remain a challenge in key markets (2024). |
| Grid Access & Offtake Agreements | Securing grid connections and favorable power purchase agreements (PPAs). | Established players have existing relationships and secured contracts. | Grid connection costs can reach hundreds of millions of dollars. |
| Economies of Scale & Experience | Lower per-unit costs and reduced project risks from operational experience. | Difficult for new entrants to match cost-efficiency and risk management. | Ørsted commissioned over 9 GW offshore wind capacity globally (by 2024). |