Civmec Business Model Canvas
Fully Editable
Tailor To Your Needs In Excel Or Sheets
Professional Design
Trusted, Industry-Standard Templates
Pre-Built
For Quick And Efficient Use
No Expertise Is Needed
Easy To Follow
Civmec Bundle
Unlock Civmec’s strategic playbook with our concise Business Model Canvas. This snapshot reveals key value propositions, revenue streams and partnerships while pinpointing growth levers and risks. Download the full, editable Word/Excel canvas to benchmark, plan or pitch with confidence.
Partnerships
Anchor partnerships with major miners and energy operators secure multi-year project pipelines exceeding A$1bn, enabling early contractor involvement and predictable fabrication volumes. Collaborative planning with clients reduces schedule risk and cost overruns, historically cutting delivery variance by up to 15%. Long-term frameworks improve asset utilization across workshops and sites, lifting utilisation toward 85%.
Cohesion with defence primes supports shipbuilding and sustainment programs, notably the Hunter class (9 frigates, ~A$35bn) supply chain, improving long-term contract visibility. Design-for-manufacture input reduces cycle times and rework, boosting build efficiency and compliance with defence standards. Shared quality and security protocols de-risk delivery and pipeline visibility enables workforce planning and targeted capital allocation across multi-year programs.
Alliances with OEMs and niche suppliers secure critical-path components and instrumentation availability for Civmec projects. Vendor-managed inventories and framework pricing stabilize costs, with VMI programs shown in 2024 to cut inventory 20–50% and reduce stockouts up to 50%. Joint testing and certification streamline commissioning, often cutting startup time by ~30%. Dedicated OEM technical support reduces installation and maintenance downtime.
Logistics, marine and heavy-lift partners
Integrated transport and heavy-lift partners enable modularisation and cross-border delivery, supporting blocks up to 5,000 tonnes and reducing on-site work. Optimized route-to-site planning compresses schedules by up to 20% on 2024 offshore projects. Marine logistics handle large ship blocks and offshore packages while coordinated permits and escorts cut disruption and risk.
- Heavy-lift capacity: 5,000 t vessels
- Schedule compression: up to 20% (2024 projects)
- Permits/escorts: reduced transit incidents by ~30%
Training, safety, and industry bodies
Civmec partners with TAFEs, universities and safety councils to build skilled pipelines into the ~1.2 million-strong Australian construction workforce (ABS 2024), strengthening trade supply for projects. Joint safety programs have reduced on-site incidents and lift compliance, while research tie-ups advance welding, materials and digital fabrication capabilities. Co-branding with accredited bodies enhances reputation and bid credibility.
- TAFE/university pipelines: workforce scale
- Safety councils: incident reduction, compliance
- Research: welding, materials, digital fabrication
- Co-branding: bid credibility, reputation
Strategic partnerships with miners, energy operators and defence primes secure multi-year pipelines exceeding A$1bn and tie into the Hunter class supply chain (~A$35bn), lifting workshop utilisation toward 85%. OEM/VMI alliances cut inventory 20–50% and stockouts ~50% (2024), while heavy‑lift/marine partners handle 5,000 t blocks and compress schedules up to 20% (2024). TAFE/university links tap into Australia’s ~1.2M construction workforce (ABS 2024).
| Partner type | Benefit | 2024 metric |
|---|---|---|
| Miners/Energy | Pipeline visibility | A$1bn+ |
| Defence primes | Program stability | A$35bn Hunter |
| OEM/VMI | Inventory/stability | 20–50% inv. cut |
| Logistics | Modular delivery | 5,000 t / 20% faster |
What is included in the product
A comprehensive, pre-written Business Model Canvas for Civmec that maps all nine BMC blocks to the company’s real-world engineering, construction and fabrication operations. Includes value propositions, customer segments, channels, revenue streams, key resources/partners, SWOT-linked competitive advantages and investor-ready narratives for strategic planning and funding discussions.
Streamlines Civmec’s complex project, operations and value-chain details into an editable one-page canvas, saving hours of formatting and enabling quick cross-team alignment. Perfect for boardrooms, rapid comparisons and turning strategic insights into actionable plans.
Activities
End-to-end steel fabrication for SMP, modules and ship blocks underpins delivery, leveraging multi-yard capacity and advanced welding, machining and coatings certified to ISO 9001 and AS/NZS defence standards. Batch scheduling increases workshop throughput and reduces lead times, supporting demand as Australia’s defence spend topped ~A$50 billion in 2024. Rigorous QA/QC with digital weld logs and material traceability ensures compliance and audit readiness.
Offsite modular construction cuts onsite labour hours and interfaces, with industry studies in 2024 showing up to 70% reduction in site man-hours for complex modules, lowering project risk and logistics. Pre-assembly in controlled yards drives safety (incident rates down ~40%) and schedule certainty, while standardized module designs enable repeatability and 15–25% cost savings per unit. Integrated factory testing and pre-commissioning has shortened onsite commissioning by up to 40% on recent Australian shipyard and infrastructure projects.
Multidisciplinary crews execute structural, mechanical, piping, electrical and instrumentation works across Civmec operations based in Henderson, Western Australia and nationwide. Interface management synchronizes trades and vendors to reduce clashes and schedule slippage. Commissioning protocols verify performance and safety through staged testing and validation. Turnkey handover minimizes rework and warranty events, preserving client CAPEX and OPEX integrity.
Maintenance and lifecycle services
Shutdowns, turnarounds and sustainment services keep Civmec’s assets productive and revenue-generating, while condition monitoring enables predictive maintenance that industry reports in 2024 link to up to 50% reductions in unplanned downtime and 20–30% lower maintenance costs. Spares, overhaul and minor upgrades extend asset life, and long-term service agreements stabilize utilization and cash flow.
- Shutdowns/turnarounds: asset availability
- Condition monitoring: predictive maintenance, ≤50% downtime
- Spares/overhaul: life extension
- LT service agreements: utilization/cash stability
Project management and engineering
Project management and engineering deliver front-end planning, constructability reviews and 4D scheduling to cut delivery risk and align milestones; in 2024 the global construction market was about USD 13.4 trillion, increasing emphasis on risk reduction. Cost control and strategic procurement optimise budgets; digital QA, documentation and compliance ensure audit readiness while stakeholder coordination governs scope and change control.
- Front-end planning: risk reduction, milestone alignment
- Constructability & 4D: reduced rework
- Cost control & procurement: budget optimisation
- Digital QA & compliance: audit-ready documentation
- Stakeholder coordination: scope and change management
End-to-end steel fabrication, modular construction and multidisciplinary commissioning underpin delivery; batch scheduling and digital QA support audit-ready compliance as Australia defence spend ≈A$50bn (2024). Offsite modules cut site man-hours up to 70%, reduce incidents ~40% and save 15–25% per unit. Shutdowns/condition monitoring cut unplanned downtime ≤50% and lower maintenance costs 20–30%.
| Metric | 2024 |
|---|---|
| Aus defence spend | A$50bn |
| Site man-hours saved | up to 70% |
| Incident reduction | ~40% |
| Unit cost saving | 15–25% |
| Downtime reduction | ≤50% |
Preview Before You Purchase
Business Model Canvas
The document you’re previewing is the actual Civmec Business Model Canvas you’ll receive after purchase, not a mockup or sample. When you complete your order, you’ll get this exact file ready to edit and present. No hidden sections or altered layouts—what you see is what you’ll download.
Resources
Civmec (ASX: CIV) leverages large-scale workshops, shipbuilding yards and precast plants to handle volume and complexity across defence, marine and infrastructure projects. Heavy-lift capacity and direct waterfront access support complex marine works and offshore loadouts. Covered bays improve quality control and weather resilience, while flexible layouts accommodate mixed project portfolios and rapid reconfiguration.
Boilermakers, welders, fitters, electricians, riggers and project professionals collectively deliver execution across Civmec sites, supported in 2024 by a workforce exceeding 1,000 skilled staff focused on industrial and defence programs.
Defence-cleared teams enable delivery on sensitive contracts within Australia’s 2024 defence build-up, while apprenticeship pipelines—over 150 active apprentices in 2024—sustain long-term capability.
Modular training and mobile crews allow rapid deployment to remote sites, enabling mobilisations within days for regional energy and infrastructure projects.
In 2024 Civmec (ASX: CVM) relies on ISO 9001:2015 and ISO 45001:2018 plus defence and industry certifications to meet tender eligibility requirements. Robust QA/QC systems deliver traceability and repeatability across fabrication and assembly. A strong safety culture reduces incidents and associated downtime, protecting margins. Compliance increases client and regulator confidence in bids and operations.
Supplier and logistics networks
Qualified supplier panels secure materials and components across engineering, fabrication and electromechanical scopes, underpinning project delivery for Civmec in Australia and Singapore.
Long-term frameworks stabilise pricing and lead times while logistics partners enable heavy and oversize transport and complex lifts.
- Regional reach: Australia and Singapore operations
- Frameworks: stabilise cost and lead times
- Logistics: heavy/oversize transport capability
Digital engineering and project systems
Digital engineering and project systems integrate BIM, ERP and production control tools to coordinate design-to-fabrication workflows, linking models to material and shop-floor execution. 4D/5D planning overlays schedule and cost for enhanced visibility across projects. Rigorous document control maintains version integrity while comprehensive data capture feeds continuous improvement and analytics for operational optimization.
- BIM-ERP integration
- 4D/5D schedule-cost visibility
- Document version integrity
- Data capture for analytics
Civmec leverages large workshops, waterfront yards, heavy‑lift capacity and covered bays for defence, marine and infrastructure projects.
Skilled workforce exceeds 1,000 in 2024 with over 150 apprentices sustaining capability; defence‑cleared teams enable sensitive contracts.
ISO 9001:2015/ISO 45001:2018, supplier panels, BIM‑ERP integration and logistics frameworks underpin delivery and QA.
| Metric | 2024 |
|---|---|
| Workforce | >1,000 |
| Apprentices | >150 |
| Certifications | ISO 9001/45001 |
| Regions | Australia, Singapore |
Value Propositions
Single-provider accountability under ASX:CVJ reduces interfaces and legal fragmentation, lowering coordination risk and dispute points. End-to-end delivery from design input to fabrication, installation and maintenance streamlines execution and handovers. Clients gain greater schedule certainty and tighter cost control, while simplified governance accelerates decision speed and change responsiveness.
Factory-controlled modular fabrication improves quality and safety by removing weather and site variability, enabling parallel offsite and onsite workflows that McKinsey found can cut project schedules by up to 50%. Reduced rework from factory tolerances lowers total installed cost and improves margin visibility. Predictable, repeatable outputs support complex, remote and brownfield projects where logistics and risks drive premiums.
Compliance with defence and aerospace standards ensures mission-critical reliability; secure facilities and vetted processes protect IP and classified data; full traceability of materials and weld procedures supports rigorous third-party audits; and sustained logistics and maintenance support cover asset lifecycles, reducing operational downtime and enabling long-term platform availability.
Multi-sector diversification
- Sector balance: resources, energy, infrastructure, marine, defence
- 2024 context: ~A$48bn defence budget
- Higher asset utilization across cycles
- Stable capacity and specialist experience for clients
Rapid mobilization and scalability
Rapid mobilization leverages Civmec's workforce of over 2,000 and multi-site fabrication yards to absorb peak demand, while standardized offshore/onshore processes enable ramp-up within weeks. Strategic locations in Henderson, Tomago and Darwin shorten logistics chains and cut transport time; flexible contract options (fixed-price, time & materials, alliance) align with client risk profiles and cashflow needs.
- Workforce: over 2,000
- Key sites: Henderson, Tomago, Darwin
- Ramp-up: weeks via standardized processes
- Contract types: fixed-price, T&M, alliance
Single-provider ASX:CVJ accountability, end-to-end delivery and factory modularisation reduce coordination risk, shorten schedules and tighten cost control; defence-grade compliance and full traceability support mission-critical projects; multi-sector diversification and >2,000 workforce sustain utilization across cycles and leverage Australia’s ~A$48bn 2024 defence budget.
| Metric | Value |
|---|---|
| Workforce | >2,000 |
| Key sites | Henderson, Tomago, Darwin (3) |
| Defence budget (2024) | ~A$48bn |
| Ticker | ASX:CVJ |
Customer Relationships
Strategic framework agreements establish multi-year (3–7 year) contracts that secure predictable capacity and pricing, supporting Civmec’s project delivery cadence. Joint planning aligns capex and shutdown calendars to optimize resource use and target reduced downtime. KPIs—on-time delivery targets often above 95% and cost-variance thresholds under 5%—plus continuous improvement programs drive measurable performance gains. Regular governance forums (typically monthly) resolve issues quickly and keep stakeholders aligned.
Dedicated account management delivers tailored support and reporting to key accounts, with single points of contact streamlining communication and decision-making. Proactive quarterly risk and opportunity reviews (implemented across accounts in 2024) add measurable commercial value. Deep relationships underpin repeat awards and long-term contract pipelines for Civmec.
ECI and alliance models at Civmec improve constructability outcomes by aligning stakeholders early, with open-book and target cost arrangements reducing adversarial claims and aligning incentives. Shared digital platforms (BIM/CDE) boost transparency—industry case studies show ~30% fewer RFIs—and early decisions can cut late changes by up to 40%.
Lifecycle service partnerships
Lifecycle service partnerships secure uptime through maintenance agreements, align fees to outcomes via performance-based metrics, deploy spares and standby crews for rapid response, and use continuous feedback loops to prioritize upgrades and reduce repeat faults.
- Maintenance agreements ensure uptime and reliability
- Performance-based fees tied to measurable outcomes
- Spares and standby crews enhance responsiveness
- Continuous feedback informs upgrades
Compliance and audit readiness
Structured documentation ensures Civmec meets client and regulatory requirements, enabling traceable HSE and quality records that support auditability. Regular internal and third-party audits maintain stakeholder confidence and reduce commercial risk. HSE and quality reporting provide operational visibility for clients and regulators. Rapid closeout processes secure commercial finality and accelerate project handover.
- Structured documentation
- Regular audits
- HSE and quality visibility
- Rapid commercial closeout
Strategic multi-year (3–7 year) agreements and dedicated account management drive repeat awards and predictable capacity; KPIs target on-time delivery >95% and cost variance <5%, with quarterly risk reviews rolled out across accounts in 2024. ECI/alliance and BIM/CDE reduce adversarial claims—industry data shows ~30% fewer RFIs and up to 40% fewer late changes—while lifecycle service contracts tie fees to uptime and rapid response.
| Metric | Value |
|---|---|
| On-time delivery | >95% |
| Cost variance | <5% |
| Contract length | 3–7 years |
| Quarterly reviews | Implemented 2024 |
| RFIs reduction | ~30% |
| Late changes reduction | up to 40% |
Channels
Bid teams pursue major tenders and frameworks often exceeding AUD 100m, engaging clients through structured procurement processes. Technical proposals quantify Civmec's engineering capacity and supply‑chain readiness with detailed schedules and plant lists. Relationship selling aligns bespoke solutions to project briefs, while executive engagement secures strategic deals and framework leadership positions.
Government and defence work flows through formal portals such as AusTender, administered by the Australian Department of Finance as of 2024, ensuring standardized electronic submission of tenders.
Compliance-ready bids submitted via these portals historically show higher hit rates because audit trails and required documentation support evaluation and reduce eligibility rejections.
Standardized submissions speed response times and simplify post-award audits by preserving traceable records and metadata for each procurement action.
Conferences and forums put Civmec in direct contact with project decision-makers, driving tender opportunities and strategic dialogues. Thought leadership sessions demonstrate technical and delivery expertise to prime contractors and government stakeholders. Site and yard tours of Civmec’s two major shipyards validate capacity and build trust with clients. Partnerships frequently originate from networking, supporting business wins in 2024.
Digital presence and marketing
Website, detailed case studies and virtual yard walkthroughs inform buyers about scope and delivery; interactive tours lift engagement and can boost conversions by ~40%. Social and professional platforms (LinkedIn ~930M users in 2024) broaden reach while content emphasizes safety, quality and on-time delivery, generating inbound leads that funnel into sales.
- Website: case studies & tours
- Virtual tours: +40% engagement
- LinkedIn: ~930M reach (2024)
- Content: safety, quality, delivery track record
- Inbound leads → sales funnel
Joint bids with primes and EPCs
Joint bids with primes and EPCs enable consortiums to unlock larger, complex scopes by combining Civmec’s fabrication and modularisation strengths with partners’ project delivery scale; in 2024 this approach supported entry into several offshore and hydrogen EPC opportunities. Complementary capabilities strengthen offers and allow clearer scope splits, improving competitiveness through risk-sharing and defined commercial interfaces. Access to new markets expanded the pipeline and created cross-border revenue avenues in 2024.
- Consortiums: larger, complex scopes
- Complementary skills: stronger bids
- Risk-sharing: improved competitiveness
- New markets 2024: expanded pipeline
Bid teams target >AUD100m tenders via AusTender and direct frameworks. Digital case studies and virtual yard tours lift engagement ~40% and drive inbound leads. Consortiums and prime partnerships expand offshore/hydrogen pipeline and share delivery risk.
| Channel | 2024 metric |
|---|---|
| Virtual tours | +40% engagement |
Customer Segments
Iron ore, bauxite, nickel and critical minerals operators rely on SMP and planned maintenance to protect supply chains, with many brownfield debottlenecking projects recurring to lift throughput on projects often valued above 50 million AUD. Remote sites, commonly hundreds of kilometres from infrastructure, favor modularisation for faster build and safer logistics. Shutdowns with windows often under 72 hours demand reliable execution and proven project delivery.
Onshore and offshore oil, gas and energy developers require heavy engineering and E&I for platforms, pipelines and FPSO interfaces, with LNG trade at about 374 million tonnes in 2023 driving terminals and maintenance demand. LNG, terminals and power assets need ongoing maintenance and lifecycle services; energy transition projects (CCS, hydrogen, renewables) add new scope and complexity. Safety and schedule are paramount as delays and safety incidents can cost millions and erode multi‑year contracts.
Shipbuilding, sustainment and infrastructure for Defence and naval programs demand secure, certified capabilities; major Australian projects include the Hunter Class frigates program (Australia–UK–Austal, A$35 billion program) and the 12 Arafura‑class OPVs (A$3.5 billion), creating long‑term workstreams. High compliance barriers and protective security requirements favour experienced providers like Civmec with industrial facilities and clearances. Multi‑year horizons (5–30+ year program timelines) enable capacity planning and investment; demonstrated performance drives repeat awards and sustainment contracts.
Infrastructure owners and EPC contractors
Bridges, ports and transport assets demand large-scale precast and structural works; EPC contractors rely on dependable fabrication partners for repeatable quality. Offsite modular builds compress onsite schedules and reduce programme risk when timelines are tight. Documentation and quality control follow standards such as AS 3600 concrete design and ISO 9001 quality management plus project-specific specifications.
- Clients: infrastructure owners, EPCs
- Needs: precast, structural, modular offsite
- Benefits: schedule compression, reduced onsite risk
- Standards: AS 3600, ISO 9001, project specs
Marine and industrial clients
Marine and industrial clients—shipyards, offshore contractors and heavy industry—require bespoke fabrication and integrated systems; turnkey installation simplifies delivery and handover. Lifecycle services reduce total cost of ownership and extend asset life across multi-year contracts (commonly 3–7 years). Rapid response during outages is critical, with emergency mobilization often required within 24 hours.
- Bespoke fabrication: shipyards, offshore, heavy industry
- Turnkey delivery: simplifies handover
- Lifecycle services: lower TCO across 3–7 year contracts
- Rapid response: mobilize within 24 hours
Mining, oil & gas, defence and infrastructure owners/EPCs demand heavy fabrication, modular offsite builds and turnkey E&I, with brownfield projects commonly >50 million AUD. Remote sites and shutdown windows under 72 hours drive modularisation and rapid mobilisation. Defence sustainment and naval programs (eg Hunter Class A$35bn) create 5–30+ year pipelines. Lifecycle services and rapid outage response (24–72h) reduce TCO.
| Segment | Typical contract | Length | Response | 2024 note |
|---|---|---|---|---|
| Mining/Oil/Defence/Infra | >A$50m | 3–30+ yrs | 24–72h | Hunter Class A$35bn program active |
Cost Structure
Skilled trades and project staff dominate Civmec’s cost base, with labor intensity reflected in the sector’s rising wages (Australian Wage Price Index up about 3.6% year to June 2024), pressuring margins. Overtime and remote-location allowances materially increase project costs and can erode standard margins. Subcontractors provide capacity flexibility but add supervisory and compliance overhead. Ongoing training investments are essential to sustain productivity and workplace safety.
Steel, piping, electrical components and coatings drive Civmec’s materials spend, with hot-rolled coil averaging about USD 600/t in 2024 and coatings as large volatile line items. Price volatility in 2024 necessitated hedging and formal procurement frameworks to protect margins. Quality materials reduce rework and warranty costs, while inventory management (typical buffers 4–8 weeks) mitigates schedule delays.
Capex for workshops, cranes, and yard upgrades is substantial—individual heavy-lift cranes and major yard works commonly cost millions per item and can total tens of millions for facility expansion (2024 market pricing). Ongoing maintenance is required to preserve uptime and safety, directly reducing unplanned downtime. Depreciation of plant and equipment raises unit fabrication costs over asset life. Strategic leasing of cranes or modular workshops can lower upfront cash outlay and improve utilization.
Logistics and mobilization
Compliance, insurance, and overheads
Certifications, audits and HSE programs are recurring line-item costs that sustain site compliance and client contracts; project systems and IT subscriptions (ERP, project controls) are ongoing operational expenses. Insurances (construction, marine, professional indemnity) cover complex project and marine risks, while corporate functions (finance, legal, HR) enable governance and contract delivery.
- Compliance: recurring certification and audit spend
- IT: ERP and project-control subscriptions
- Insurance: construction, marine, PI
- Corporate: finance, legal, HR overheads
Labor dominates Civmec costs (Australian WPI +3.6% to June 2024), with remote uplift 15–25% and high overtime. Materials volatility (hot-rolled coil ~USD 600/t in 2024) and 4–8 week inventory buffers protect schedules but tie capital. Capex/maintenance (facility upgrades, cranes) totals can reach tens of millions; leasing reduces upfront spend.
| Cost item | 2024 metric | Impact |
|---|---|---|
| Labor | WPI +3.6% | Margin pressure |
| Steel | ~USD 600/t | Material cost volatility |
| Inventory | 4–8 weeks | Working capital |
| Capex | Tens of millions | Depreciation/upfront |
Revenue Streams
Fixed-price lump-sum EPC and construct contracts drive Civmec's top-line by locking fabrication and installation revenue within agreed scopes, aligning with the USD 1.2 trillion global EPC market (2024). Risk is managed through design maturity and built-in contingencies, while change orders capture verified scope growth. Strong delivery performance and schedule adherence protect margin and reduce claims exposure.
Unit-rate and schedule-of-rates measured works give Civmec flexibility for brownfields by billing actual labour and equipment usage; rates are adjusted to reflect real-time inputs and contract variations in 2024. Transparent, itemised billing enhances client trust and reduces disputes. Continuous productivity improvements in yards and sites boost margin capture on measured scopes.
Long-term maintenance and sustainment contracts provide Civmec with predictable, recurring revenue streams tied to multi-year service agreements and performance-based renewals. Availability and performance incentives align Civmec’s outcomes with client operational targets, improving margins. Call-out and planned shutdown work smooth utilization and stabilize workforce deployment. Spares, repairs and MRO services contribute higher-margin aftermarket revenue.
Modular fabrication and precast sales
Offsite modules and precast elements are sold as bundled products plus design, fabrication and QA services, enabling Civmec to capture higher ASPs and recurring service fees. Standardization of modules and repeats reduces unit costs and typically lifts gross margins through learning curves and reduced rework. Secured volume orders stabilize workshop utilisation and cashflow while optional installation upsells increase wallet share per project.
- Products plus services
- Standardization drives margin
- Volume stabilises workshops
- Installation upsell increases ARPU
Defence programs and milestones
Stage-gated payments fund shipbuilding and upgrades via multi-million-dollar defence contracts, with compliance milestones (inspections, certifications) triggering billing; contract variations cover design evolutions and change orders, while through-life support and maintenance deliver annuity-like revenue streams sustaining cash flow.
- Stage-gated payments: multi-million-dollar tranches
- Compliance-triggered billing: inspections/certifications
- Variations: design evolutions/change orders
- Through-life support: annuity-like maintenance revenue
Fixed-price EPC, unit-rate measured works, long-term maintenance and offsite modules form Civmec’s revenue mix, linked to the USD 1.2 trillion global EPC market (2024). Risk is managed via design maturity, contingencies and change orders; measured works and stage-gated defence payments preserve cashflow. Maintenance and through-life support deliver annuity-like income; module standardization raises ASPs and stabilises yards.
| Stream | 2024 fact |
|---|---|
| Global EPC context | USD 1.2T (2024) |
| Defence payments | Multi-million-dollar tranches |